    High-pressure pipeline plugging airbag is designed for reliable temporary sealing during pipeline maintenance, repair, pressure testing, and emergency operations. Made from reinforced rubber composite materials, it offers strong pressure resistance, excellent sealing performance, corrosion resistance, and easy installation for municipal drainage, sewage, water supply, and industrial pipeline applications.
  • делиться:
  • контакт Онлайн-запрос
  • почтовый ящик:17333828767@163.com
High-pressure pipeline plugging airbag for Sewer Testing, Pipeline Repair and Temporary Isolation

When a pipeline must be repaired, tested or temporarily isolated, the first problem is usually not the repair itself. The real problem is how to stop the flow safely and create a controlled working section without cutting out a large part of the pipeline.

This is exactly what our High-pressure pipeline plugging airbag is designed to do.

We manufacture and supply reinforced Inflatable Pipeline Plugs for municipal drainage systems, sewer pipelines, wastewater treatment projects, water conservancy engineering, water supply and drainage systems, and suitable chemical pipelines. The airbag is inserted into the pipe in a deflated condition, inflated at the required position, and expanded against the internal pipe wall to create a temporary seal. When the operation is finished, the pipeline pressure is released, the airbag is deflated, and it can be removed for cleaning and later reuse.

Our pipeline plugging airbags are made from a rubber and fiber reinforced composite material. The rubber gives the product flexibility and sealing contact, while the reinforcing fiber structure improves strength and helps the airbag handle inflation stress. The material structure also provides good airtightness, wear resistance, ageing resistance and resistance to a range of acidic and alkaline working environments.

At Hengshui Qingchuan Trading Co., Ltd., we have worked in rubber and plastic engineering products for eight years. Our customers are involved in municipal pipeline maintenance, bridge installation, water conservancy construction and other infrastructure work. Because of this background, we do not look at a high-pressure inflatable pipe plug as just another rubber product. Pipe diameter, pressure, pipeline material, medium, access conditions and the actual purpose of the job all matter.

If you are looking for a High-pressure pipeline plugging airbag manufacturer in China, this page explains how the product works, where it can be used, what should be checked before ordering and what we do before shipment.

1. What Is a High-pressure Pipeline Plugging Airbag?

A High-pressure pipeline plugging airbag is a flexible inflatable device used to temporarily close or isolate a pipe. Depending on the market and application, buyers may also call it a pipeline plugging bladder, inflatable pipe plug, pneumatic pipe plug, Sewer blocking airbag, rubber pipe stopper, pipeline isolation airbag or high-pressure pipe blocking bag.

Although the names are different, the basic idea is simple.

The airbag is placed inside the pipe before inflation. Air is then supplied through the inflation connection. As the pressure inside the airbag increases, the rubber body expands until its outside surface makes firm contact with the inner wall of the pipe.

This contact creates the temporary sealing area.

Once the plug has been correctly installed, inflated and restrained, the isolated pipe section can be used for operations such as:

  • Municipal sewer repair

  • Stormwater pipeline maintenance

  • Closed-water testing

  • Pipeline leakage inspection

  • Wastewater treatment system maintenance

  • Emergency pipeline repair

  • Temporary pipeline isolation

  • Drainage engineering

  • Water conservancy projects

  • Suitable chemical pipeline maintenance

Compared with building a temporary wall or installing a permanent mechanical closure, an inflatable pipeline plugging airbag is easier to transport and can normally be removed quickly after use.

That makes it especially useful for contractors who move from one site to another or handle emergency maintenance work.

However, we do not recommend choosing an inflatable pipe plug only by looking at the nominal pipeline diameter. The actual internal diameter, pipe material, expected back pressure and application are just as important.

Information to ConfirmWhy We Ask for ItExample
Actual internal pipe diameterDetermines whether the airbag can expand within its intended working range.Do not rely only on DN or nominal pipe size.
Pipe materialConcrete, steel and plastic pipes can have different surface conditions and friction.Concrete sewer, plastic drainage pipe, steel process pipe.
Expected back pressurePressure acting behind the plug produces force that must be considered during selection and restraint.Water head, temporary flow pressure or test pressure.
Working mediumThe medium can affect material compatibility.Water, sewage or an acidic/alkaline process medium.
ApplicationTesting, emergency repair and temporary isolation create different working conditions.Closed-water test or repair isolation.
Access conditionsManholes and narrow entrances can affect installation and handling.Underground sewer manhole or restricted maintenance opening.

Table source: Hengshui Qingchuan Trading Co., Ltd. project selection practice, combined with general pipeline plug installation principles reflected in ASTM sewer testing procedures. Final product selection must be based on the actual project conditions.

The most useful quotation request is therefore not simply, “Please quote one 800 mm plug.” A better request tells us what the pipe is, why it needs to be blocked, what pressure may occur and how the product will be installed.

2. How Does a High-pressure Inflatable Pipe Plug Work?

The working principle is not complicated, which is one reason inflatable plugging equipment is popular in pipeline maintenance.

First, the pipeline plugging airbag is inspected before use. The operator checks the rubber surface, reinforcing area, inflation connection, hose and valve. Sharp objects, construction waste or hard deposits inside the installation area should be removed where practical because they may damage the surface during inflation.

The deflated airbag is then inserted into the selected part of the pipe.

After correct positioning and suitable restraint, the operator connects the inflation system and gradually increases pressure according to the specified operating requirements for that airbag model.

As the airbag expands, it contacts a larger area of the internal pipe wall. This produces friction and sealing contact around the circumference of the pipe.

When the seal is stable, the downstream or upstream section can be isolated for testing, maintenance or repair.

After the work has been completed, the process is reversed, but the order is important.

The pressure or stored water behind the plug should be released first. The airbag should only be deflated after the back pressure has been safely removed. It can then be taken out of the pipeline, cleaned, inspected and stored.

Typical Installation Sequence

  1. Measure and confirm the actual internal diameter of the pipeline.

  2. Check the required airbag model and its rated operating specification.

  3. Inspect the airbag, inflation hose, valve and fittings.

  4. Inspect the pipe surface around the installation point.

  5. Remove sharp debris that could damage the rubber surface.

  6. Place the deflated airbag in the required position.

  7. Install suitable restraint or bracing.

  8. Connect the inflation and monitoring system.

  9. Inflate gradually to the specified pressure.

  10. Check whether the sealing condition is stable.

  11. Carry out the planned pipeline test or maintenance operation.

  12. Release water pressure or other back pressure before plug deflation.

  13. Deflate the airbag completely.

  14. Remove, clean and inspect the product.

This sequence looks basic, but skipping one step can create unnecessary risk.

For example, increasing inflation pressure is not the correct solution when a plug is poorly positioned. If the wrong airbag size has been selected, or if the pipe surface is badly damaged, simply adding more pressure can make the situation worse.

The same applies to restraint. An inflated plug exposed to pipeline back pressure can experience strong axial force. The plug should therefore be properly restrained according to the project procedure.

ASTM F1417, which addresses installation acceptance testing of plastic non-pressure sewer lines using low-pressure air, states that connections and service laterals should be plugged and adequately braced to withstand test pressure.

Although every application is different, this gives contractors a useful principle: sealing pressure and mechanical restraint should be considered together.

3. Why We Use Rubber and Fiber Reinforced Composite Material

A pipeline plug needs to do two different jobs at the same time.

It needs to stay flexible enough to enter the pipe and expand against the internal wall, but it also needs enough reinforcement to withstand repeated inflation stress.

This is why our high-pressure pipeline plugging airbag uses a rubber and fiber reinforced composite construction.

Rubber for Flexible Sealing Contact

Rubber allows the body to expand and follow the shape of the pipe wall. This flexibility helps create a large sealing contact area rather than relying on one narrow rigid sealing edge.

It also allows the airbag to be deflated into a much smaller volume for handling and transportation.

Fiber Reinforcement for Higher Structural Strength

When compressed air enters an inflatable plug, the internal pressure creates stress throughout the body. Reinforcing fibers help control expansion and support the rubber structure.

For contractors carrying out repeated maintenance work, this is important because the product is expected to handle more than one inflation cycle when it remains in good condition.

Good Airtightness

A plugging airbag that cannot maintain its inflation condition is difficult to use for pipeline isolation.

For this reason, airtightness is one of our important factory inspection points. Before shipment, our products undergo a pressure-holding airtightness test.

This gives us a chance to identify obvious leakage problems before the product is packed and sent to the customer.

Wear and Ageing Resistance

Pipeline construction sites are rough environments. The airbag may contact concrete, steel, plastic, sediment and construction dirt during installation and removal.

A wear-resistant outer structure helps the airbag handle repeated handling better than a simple thin rubber bladder.

Ageing resistance is also important because pipeline plugs are often stored between projects. They may spend weeks or months inside a maintenance warehouse or service vehicle before the next job.

Acid and Alkali Resistance

Our material system is designed to provide resistance to a range of acidic and alkaline environments, making the product useful for some wastewater and chemical pipeline applications.

However, we do not treat the term acid and alkali resistant pipeline plug as meaning “suitable for every chemical.”

Chemical compatibility depends on more than the name of the liquid.

Concentration, temperature, contact time and the exact chemical composition can all affect rubber materials. If you intend to use the airbag inside a chemical pipeline, we recommend sending us the medium name, approximate concentration, operating temperature and expected contact duration before ordering.

This is much safer than assuming that one rubber product can handle every acid, alkali or industrial chemical.

Material / Design FeaturePractical FunctionWhy It Matters on Site
Rubber outer bodyProvides flexibility and sealing contact.Allows the plug to expand against the internal pipe wall.
Fiber reinforcementHelps support pressure load and control expansion.Improves structural strength during inflation.
Airtight constructionHelps maintain inflation pressure.Supports stable temporary pipeline isolation.
Wear-resistant structureReduces damage from normal handling and pipe contact.Useful for reusable maintenance equipment.
Ageing-resistant materialHelps reduce deterioration during normal service and storage.Important when plugs are reused across different projects.
Acid/alkali resistanceSupports use with a range of suitable industrial media.Useful for wastewater and selected chemical pipeline work, subject to compatibility confirmation.

Table source: Hengshui Qingchuan Trading Co., Ltd. product material and application information. Chemical suitability must be confirmed according to the actual medium, concentration, temperature and contact duration.

4. Where Can Our Pipeline Plugging Airbags Be Used?

Most customers do not buy a pipeline plug because they want “a rubber product.” They buy one because they need to solve a specific jobsite problem.

Below are several of the applications we see most often.

Municipal Sewer Pipeline Repair

Municipal sewer systems require regular inspection, cleaning, rehabilitation and emergency repair.

When a damaged section needs to be isolated, an inflatable sewer pipeline plug can be placed upstream or downstream to create a temporary working section.

Because the airbag is transported in a deflated state, maintenance teams can carry it to underground pipeline sites more easily than many rigid isolation devices.

Stormwater Drainage Systems

Storm drains may need temporary blocking during repair, connection work or inspection.

A correctly selected inflatable drainage pipe plug can provide temporary isolation without installing a permanent structure inside the line.

Closed-water Pipeline Testing

Newly installed or repaired sewer lines may need leakage or integrity testing according to the applicable project specification.

Inflatable plugging equipment can be used to help isolate the test section.

ASTM C969-24 covers procedures for water infiltration and exfiltration acceptance testing of installed precast concrete pipe sewer lines and manholes. The standard states that the procedure is used to demonstrate the integrity of installed materials and construction under the specified test conditions.

The exact acceptance limits and testing method should always follow the project specification, local authority requirements and applicable standard.

Wastewater Treatment Plants

Wastewater treatment facilities often contain many connected pipe sections. Maintenance may require one section to be temporarily isolated while other equipment remains in operation.

A reusable pipeline plugging airbag can be practical for these maintenance tasks when the pipe size, pressure and wastewater conditions are suitable.

Water Conservancy Engineering

Water conservancy projects may include drainage pipelines, culverts, temporary water systems and other underground structures.

An inflatable plug can support temporary water blocking during maintenance, inspection or construction work.

Water Supply and Drainage Projects

Contractors working on civil drainage systems may use pipeline airbags for temporary isolation, testing or repair before a section is returned to service.

The exact operating procedure should be based on whether the system is a pressure pipeline or non-pressure drainage line.

Chemical Pipeline Maintenance

For suitable chemical environments, our chemical pipeline plugging airbag can provide temporary isolation during inspection or repair.

However, this is one area where we ask customers for more information before confirming the product.

Please provide:

  • Chemical medium

  • Approximate concentration

  • Working temperature

  • Expected contact time

  • Pipe material

  • Internal pipe diameter

  • Expected pressure

This allows us to evaluate whether the proposed rubber material is suitable for the actual working environment.

Emergency Pipeline Plugging

Emergency repair is another important application.

If a pipeline is damaged unexpectedly, maintenance teams need a temporary isolation method that can be transported and installed without a long fabrication process.

A lightweight inflatable plug can be valuable here. It can be stored in a maintenance inventory, transported to the site in a compact condition and inflated only when it reaches the required position.

5. Inflatable Pipeline Plug vs Other Temporary Blocking Methods

There is no single blocking method that is best for every pipeline.

Permanent mechanical closures, fabricated barriers and inflatable plugs each have their place.

For temporary maintenance work, however, an inflatable system offers several practical advantages.

Blocking MethodInstallationRemovalTransportReusableTypical Application
High-pressure pipeline plugging airbagInserted while deflated and inflated inside the pipe.Release back pressure, deflate and remove.Compact when deflated.Yes, after inspection confirms acceptable condition.Temporary sealing, sewer testing, repair and maintenance.
Rigid mechanical pipe plugMechanically expanded or fixed in position.Requires mechanical release and removal.Usually retains fixed physical size.Normally reusable.Pipeline testing and maintenance where access permits.
Temporary fabricated barrierRequires onsite fabrication or structural installation.Requires dismantling after the work.May require multiple materials and tools.Depends on construction.Special construction conditions or large temporary isolation works.
Permanent pipeline closureInstalled as a long-term part of the pipeline system.Not intended for frequent removal.Project-specific.Not normally treated as temporary reusable equipment.Permanent abandonment or structural closure.

Table source: Hengshui Qingchuan application experience and general pipeline isolation practice. ASTM F1417 confirms the use of plugged and adequately braced pipeline connections during low-pressure sewer testing, while ASTM C969 covers water infiltration and exfiltration testing of installed precast concrete sewer systems.

The main benefit of an inflatable system is not that it can replace every other method. Its advantage is that it is especially practical when a temporary, removable and portable sealing method is required.

For contractors who move between different municipal sites, this can reduce handling work.

The plug is also reusable when it remains in safe condition. Instead of building a new temporary barrier for every job, the same airbag may be used again after cleaning and inspection.

That said, a damaged plug should not be kept in service just because it was expensive or because the next job is urgent.

Before each installation, inspect the body for abnormal wear, cuts, exposed reinforcing material, damaged fittings, leakage or deformation.

6. How We Produce, Inspect and Pack Our Pipeline Plugging Airbags

From the outside, a pipeline airbag can look like a fairly simple product. Most of the work that determines whether it is reliable happens before the customer sees it.

We start from the required structure and size. Rubber material and reinforcing fiber are combined to form the pressure-bearing body.

The reinforcing structure must support the rubber body without stopping it from expanding in the way the design requires.

Connections and inflation components are then installed according to the product structure.

Visual Inspection

Before final packing, we check the main body, connection areas and visible surface for obvious manufacturing defects.

A pipeline plugging airbag should not leave our facility with obvious surface damage that should have been found before shipping.

Pressure-holding Airtightness Test

One of our key factory checks is the pressure-holding airtightness test.

The finished airbag is inflated under the applicable factory inspection procedure so that we can check whether the product maintains its required condition during the test.

The purpose is simple: we want to find an obvious leakage problem before the product reaches the construction site, not after.

Certificate of Conformity

Qualified products are supplied with a certificate of conformity according to the order arrangement.

For engineering buyers, this is useful because the receiving department can match the delivered goods with the project purchasing record.

Packaging

Standard products are normally wrapped with protective film and placed inside a woven outer bag.

For larger products, a wooden reinforcement frame can be added when needed to reduce the risk of damage during freight handling.

Most orders are shipped through freight logistics according to destination, quantity and package size.

Delivery Time

Common specifications that are available from stock can be arranged for fast dispatch once the order and payment conditions have been confirmed.

For non-standard customized pipeline plugging airbags, the normal production cycle is approximately 5–7 working days after technical requirements are confirmed.

The exact schedule may vary according to specification, quantity and production arrangement, so we state the confirmed delivery time in the quotation.

Payment Terms

Our common B2B payment arrangement is an advance deposit, with the remaining balance settled before shipment.

Exact commercial terms are confirmed in the quotation or sales contract.

7. Why Work With Hengshui Qingchuan for Pipeline Plugging Products?

Price matters in industrial purchasing, but a cheap plug that does not match the pipe can quickly become expensive.

We prefer to start with the project conditions.

Eight Years of Rubber and Plastic Industry Experience

Hengshui Qingchuan Trading Co., Ltd. has been operating for eight years in the rubber and plastic engineering materials field.

Our work is closely connected with infrastructure applications rather than only general consumer rubber products.

Experience With Infrastructure Customers

We have established long-term cooperation with customers involved in municipal pipeline maintenance, water conservancy construction and bridge installation.

Because of this, we understand common purchasing concerns such as project deadlines, non-standard dimensions, inspection documents, packaging, transportation and repeat orders.

Standard and Customized Supply

Some projects need common pipeline plug sizes immediately. Others involve unusual pipeline diameters or special operating conditions.

We support both routes.

Regular specifications in stock can be shipped quickly, while custom products normally require about 5–7 working days after the specification is confirmed.

Factory Airtightness Inspection

The product is checked through pressure-holding airtightness testing before shipment.

This does not replace correct installation at the site, but it provides an important quality check before delivery.

Practical Industrial Packaging

We use protective film and woven packaging for normal shipments, with wooden frame reinforcement available for larger items.

Our packaging approach is based on a simple goal: protect the airbag from unnecessary puncture, abrasion and handling damage during transportation.

We Ask Questions Before Recommending a Product

We believe this is one of the most important differences between buying an engineering product and buying a general commodity.

If a customer tells us only a pipeline diameter, we may need more information before making a recommendation.

For example:

  • Is the pipeline concrete, steel or plastic?

  • Will the plug be used for a closed-water test or an emergency repair?

  • Is there water pressure behind the plug?

  • Will it contact sewage or a chemical liquid?

  • What is the working temperature?

  • How long will the pipe remain blocked?

These questions can prevent incorrect selection later.

8. Ordering Guide, Safety Notes and FAQ

What Information Should You Send for a Quotation?

For a faster quotation, we recommend sending the following information:

  • Actual internal pipe diameter

  • Pipe material

  • Required quantity

  • Application

  • Expected back pressure or water head

  • Working medium

  • Medium concentration if chemical

  • Working temperature

  • Expected blocking time

  • Required delivery date

  • Photos or drawings if available

For customized pipeline plugs, a simple drawing or site photo can save a lot of communication time.

Important Safety Notes

A high-pressure pipeline airbag should be treated as pressurized equipment while inflated.

Do not stand directly in the possible movement path of an inflated plug.

The plug should be installed with appropriate restraint or bracing according to the project procedure. The inflation pressure should remain within the specified range for the actual airbag model.

When the operation is finished, release pipeline back pressure before deflating and removing the plug.

For air testing of plastic non-pressure sewer lines, ASTM F1417 specifically requires connections and service laterals to be plugged and adequately braced to withstand the test pressure.

Local regulations, site safety rules and the approved construction method should always take priority.

Frequently Asked Questions

1. What is a High-pressure pipeline plugging airbag?

It is an inflatable rubber and fiber reinforced device used to temporarily seal or isolate a pipeline. It can be used for sewer maintenance, pipeline repair, closed-water tests, drainage projects, wastewater systems and other suitable temporary plugging operations.

2. Is it the same as an inflatable pipe plug?

The terms are often used for similar products. Buyers may also search for pneumatic pipe plug, sewer blocking airbag, rubber pipeline plug, inflatable sewer stopper, pipeline isolation bladder or high-pressure pipe blocking bag.

3. Can the airbag be reused?

Yes. The product is designed for repeated use when it remains in safe condition. It should be cleaned and inspected after each job before being stored or used again.

4. How do I choose the correct pipeline plug size?

Measure the actual internal diameter of the pipe first. Then confirm pipe material, expected back pressure and application. Nominal pipe size alone is not always enough for correct selection.

5. Can I use it for a sewer closed-water test?

Yes, suitable pipeline plugging airbags can be used to isolate a test section. The testing procedure and acceptance criteria should follow your project specification and applicable standard. ASTM C969-24, for example, covers infiltration and exfiltration acceptance testing for installed precast concrete sewer lines and manholes.

6. Can it be used for low-pressure air sewer testing?

Inflatable plugs may be part of an isolation arrangement, but low-pressure air testing has its own procedure and safety requirements. ASTM F1417 covers installation acceptance of plastic non-pressure sewer lines using low-pressure air and requires plugged connections and adequate bracing.

7. Can the airbag be used in chemical pipelines?

It can be used in suitable acidic and alkaline environments, but chemical compatibility must be checked first. Please provide the chemical name, concentration, operating temperature and expected contact time before ordering.

8. Does acid and alkali resistance mean it can resist every chemical?

No. Different chemicals can affect rubber in different ways. Even the same chemical may behave differently at different concentrations and temperatures. We therefore recommend confirming the exact working medium before use.

9. What should I do if the plug does not seal properly?

Do not immediately increase the inflation pressure. Check the airbag size, installation position, pipe wall condition, inflation specification and whether the plug is centered correctly.

10. Can I inflate the plug above its rated pressure?

No. Always follow the specified pressure range for the actual product model. Excessive inflation can damage the product and create a serious safety hazard.

11. Why does the plug need to be restrained?

Pressure acting against the face of the plug creates force in the direction of the pipe. Proper restraint helps prevent unexpected plug movement during testing or blocking operations.

12. What inspection do you perform before shipment?

Our products undergo pressure-holding airtightness testing before shipment. Qualified products are supplied with a certificate of conformity according to the order arrangement.

13. How quickly can standard pipeline plugging airbags be shipped?

Regular specifications available in stock can be arranged for fast shipment after the order and payment details are confirmed.

14. What is the lead time for customized products?

Non-standard customized products normally require approximately 5–7 working days after all technical details have been confirmed.

15. How are the airbags packed?

Normal products are wrapped with protective film and placed in woven outer bags. Larger products can be reinforced with wooden frames for transportation.

16. What are your usual payment terms?

Our common payment method is an advance deposit with the remaining balance paid before shipment. Final conditions are confirmed in the formal quotation.

17. How should the airbag be stored?

Keep it clean and dry and protect it from sharp objects, unnecessary heat, direct sunlight and harmful chemicals during storage. Avoid placing heavy tools or metal parts directly on the folded product.

18. What should I inspect before every use?

Check the rubber surface, reinforcing structure, fittings, valve, hose and inflation connection. If you see serious wear, cuts, exposed reinforcement, abnormal deformation or leakage, stop and evaluate the product before using it again.

19. Can you make non-standard pipeline plugging airbags?

Yes. We support custom production according to pipeline dimensions and project requirements. Please send us the actual internal diameter, application, working medium, pressure conditions and quantity.

20. What is the best way to get an accurate quotation?

Send us the pipe size, pipe material, working medium, expected pressure, application and quantity. For unusual pipelines, photos or drawings are also very helpful.

Tell Us About Your Pipeline Project

A High-pressure pipeline plugging airbag may look like a simple piece of equipment, but correct selection depends on real project conditions.

Whether you are preparing for a municipal sewer repair, wastewater pipeline shutdown, closed-water test, drainage maintenance job, water conservancy project or temporary chemical pipeline isolation, we recommend starting with the pipe information rather than simply choosing the lowest-priced plug.

At Hengshui Qingchuan Trading Co., Ltd., we can supply regular specifications for fast delivery and manufacture non-standard models according to project requirements.

Our products use rubber and fiber reinforced composite construction and are designed for good airtightness, pressure resistance, wear resistance, ageing resistance and reusable temporary pipeline blocking. Finished products undergo pressure-holding airtightness inspection before shipment and qualified products are supplied with a certificate of conformity.

Send us your actual pipe diameter, working medium, expected pressure, quantity and application today. We will help you choose a suitable High-pressure pipeline plugging airbag and prepare a quotation for your project.

Technical References and Data Sources

ASTM C969-24 — Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines and Manholes. This standard is referenced on this page for information concerning water infiltration and exfiltration acceptance testing of installed precast concrete sewer systems.

ASTM F1417-11a(2024) — Standard Practice for Installation Acceptance of Plastic Non-pressure Sewer Lines Using Low-Pressure Air. This standard is referenced for information concerning low-pressure air sewer testing and the requirement that connections and service laterals be plugged and adequately braced during testing.

Hengshui Qingchuan Trading Co., Ltd. Product and Manufacturing Information. This is the source for the rubber and fiber reinforced composite construction, pressure-holding airtightness inspection, acid and alkali resistance, reusable design, stock availability, customized production lead time, certificate of conformity, packaging method, freight arrangement and normal payment terms described on this page.

Important: Technical standards and project requirements may vary by country, pipe material, test method and local authority. Users should follow the current applicable engineering standard, local safety requirements, approved method statement and the operating specifications supplied with the selected pipeline plugging airbag.

Онлайн-сообщение

Пожалуйста, введите действительный адрес электронной почты.
код проверки Не может быть пустым

Связанные продукты

Нет результатов поиска!

Этот веб-сайт использует файлы cookie, чтобы обеспечить вам максимально эффективное использование нашего веб-сайта.

Принимать отклонять